LED module 300W outdoor waterproof lightning protection floodlight with 50,000 hours lifetime
Technical data:
Item name |
300W LED module flood light |
Power |
300W |
Light Source |
Lumileds 3030 |
LED Qty |
336pcs |
LED Driver |
MEANWELL Driver |
Input Voltage |
AC 85~305V 50/60Hz |
Color Temperature |
2700-6500K |
Light effect |
130LM/W |
Lumen |
39,000LM |
PF |
≥0.95 |
CRI |
Ra.≥80 |
IP |
65 |
Viewing angle |
60° 90° |
Materials |
Aluminum + PC optical lens |
Operating Temp. |
-40ºC to +60ºC |
Applications |
Tunnel,highways, subways,workshops, warehouses, etc. |
Qty / CTN |
1PC |
N.W. |
7.0KG |
G.W. |
8.0KG |
Lamp dimensions |
L516 × W223 × H229mm |
Carton size |
61 × 32 × 21cm |
Lifetime |
50,000 hours |
Quality warranty |
5 years |
Certificates |
CE,ROHS, EMC, LVD, ISO9001 |
Features:
1.High efficiency MEANWELL waterproof Driver.
2.Imported original Lumileds or Filips LED Chip.
3.Aluminum lamp housing with cooling fins,excellent structure for heat dissipation.
4.The surface of lamp housing is anti-corrosion and electrophoresis processed,can be used at seaside.
5.Dust-proof,moisture proof and waterproof, IP65 rated.
6.Excellent optics design,higher luminous efficiency.
7.Compare to traditional lamps can save energy 60%-70%.
8. 5 years warranty.
300W LED module Flood Light details:
Application:
Widely used in highways, subways, railways, tunnels and other underground passages lighting, workshops, warehouses, venues and various types of factories, construction and other places, can also be used for urban landscapes, billboards, buildings and other night lighting.
Light distribution curve and installation:
Installation instructions:
1. Non-specialist electricians please do not repair or modify this product without authorization;
2. Please turn off the power before installation;
3. Before installation, please check whether the voltage marked on the lamp is consistent with the input voltage to be connected;
4. In order to ensure the service life of the product, please do not use it in a place with strong acid mist;
5. Pay attention to shock protection during installation and transportation;
6. Before installation, ensure that the installation position can withstand 10 times the weight of the product, and install it in a flat place without vibration, no swing, no fire hazard;
7. If the lamp fails, please place the lamp in one place and send it back to the company for inspection and repair.
8. If the lamp body or wire is damaged, please stop using it immediately.
Our workshop:
We have 6 production lines at production department, including assembling, inspection and aging test lines.
Production ability: 3-5 days for 500pcs LED Floodlight, and 10-15 working days for 3000pcs LED Flood light at common requirements.
Each Lamp must pass 24 hours aging test and high voltage (6KV) surge test before we make packing and make delivery.
Our Services:
2. Excellent design team with designers of more than 12 years experience, can offer professional advice for practical application;
3. 5000,000 pcs light source annual production capacity, the products export to EU market, American market, Russia, Kazakhstan, Australia, South Africa, Zimbabwe, Vietnam, etc;
4. Good OEM & ODM business ability, 6 production lines meet your shipping requirement;
5. Export port Shenzhen, Hongkong or Shanghai;
6. Discount available for bulk order;
7. High quality component and material, Osram, Bridgelux, 3030SMD, 5050SMD, Epistar LED chips, MW / Sosen / HT/ TUV SAA CE listed driver etc, depend on your needs.
Payment Terms:
TT Bank Transfer, support 30% deposit and 70% before delivery;
PayPal, western union, Alipay etc.
NO O/A.
Delivery time:
Samples and less than 100pcs in 3-5 working days;
500pcs in 7-8 working days;
3000pcs in 15 working days.
About Shipping:
Samples sent by DHL, TNT, Fed EX, UPS, SF Express, Aramex etc. Door to door, you may pay customs tax depends on your customs policy.
By air or by sea for bulky orders available.
FAQ:
1. Are you factory supplier?
Yes, we are manufacturer of LED lamps since 2008 and we have our own factory, supply duable super quality items and reliable after-sale service.
2. Do you supply OEM or ODM?
Yes, we can supply OEM and ODM serice with favorable price and we have our own mould workshop, your brand and logo can be printed on the items.
3. How long will it spend for our orders to be sent out?
It takes 3-5 days for samples at common requirements, and 10-15 days for big order such as 3000pcs led flood light.
4. What about your after-sales servie and warranty policy?
We offer 5 years warranty for this led Flood light, by supplying you the lamp parts or new replacements for free during the warranty period for any non-human defective lamps.