LED 120W module SMD outdoor waterproof stadium special lighting floodlight
Technical data:
IP66 120W Module LED Floodlight Details:
Application:
Installation instructions:
Our workshop:
Our Services:
Item name
120W LED module flood light
Power
120W
Light Source
Philips SMD3030
LED Quantity
144 pcs
Input Voltage
AC 85~305V 50/60Hz
Color Temperature
2700-6500K
Light effect
140LM/W
Lumen
16,800LM
PF
≥0.90
CRI
Ra.≥80
IP
66
Viewing angle
60° / 90°
Materials
Aluminum
Operating Temp.
-40ºC to +60ºC
Applications
Tunnels,Square,Plaza,Garden,Lawn, etc.
Qty / CTN
8PCS
N.W.
3.0KG / PC
G.W.
4KG
Lamp dimensions
L337 x W145 x H82.1mm
Carton size
38 ×38 ×49 cm
Lifetime
50,000 hours
Quality warranty
5 years
Certificates
CE,ROHS, EMC, LVD, ISO9001
Features:
1.High efficiency MEANWELL Driver,ELG series.
2.Imported original Filips LED Chip.
3.Aluminum lamp housing with cooling fins,excellent structure for heat dissipation.
4.The surface of lamp is electrophoresis treated,oxidation resistance and anti-corrosion.
5.Dust-proof,moisture proof and waterproof ,IP66 rated.
6.Excellent optics design,higher luminous efficiency.
7.Compare to traditional lamps can save energy 60%-70%.
8.5 years warranty.
It can be widely used inTunnels,Square,Plaza,Garden,Lawn,Playground,Tennis Stadium,Golf Course,Bus Station,Airport,Sculpture,Architecture,Arts Work,Street,Factory offices,Show Room,Work Shop,Parking Lot etc.
1. Non-specialist electricians please do not repair or modify this product without authorization;
2. Please turn off the power before installation;
3. Before installation, please check whether the voltage marked on the lamp is consistent with the input voltage to be connected;
4. In order to ensure the service life of the product, please do not use it in a place with strong acid mist;
5. Pay attention to shock protection during installation and transportation;
6. Before installation, ensure that the installation position can withstand 10 times the weight of the product, and install it in a flat place without vibration, no swing, no fire hazard;
7. If the lamp fails, please place the lamp in one place and send it back to the company for inspection and repair.
8. If the lamp body or wire is damaged, please stop using it immediately.
Light distribution curve:
We have 6 production lines at production department, including assembling, inspection and aging test lines.
Production ability: 3-5 days for 500pcs LED Floodlight, and 10-15 working days for 3000pcs LED Floodlight at common requirements.
Each Lamp must pass 24 hours aging test and high voltage (2KV, 4KV, 6KV) surge test before we make packing and make delivery.
1. For all your inquires about us or our products, we will reply you in detail within 24 hours;
2. Excellent design team with designers of more than 12 years experience, can offer professional advice for practical application;
3. 5000,000 pcs light source annual production capacity, the products export to EU market, American market, Russia, Kazakhstan, Australia, South Africa, Zimbabwe, Vietnam, etc;
4. Good OEM & ODM business ability, 6 production lines meet your shipping requirement;
5. Export port Shenzhen, Hongkong or Shanghai;
6. Discount available for bulk order;
7. High quality component and material, Osram, Bridgelux, 3030SMD, 5050SMD, Epistar LED chips, MW / Sosen / HT/ TUV SAA CE listed driver etc, depend on your needs.
Payment Terms:
TT Bank Transfer, support 30% deposit and 70% before delivery;
PayPal, western union, Alipay etc.
NO O/A.
Delivery time:
Samples and less than 100pcs in 3-5 working days;
500pcs in 7-8 working days;
3000pcs in 15 working days.
About Shipping:
Samples sent by DHL, TNT, Fed EX, UPS, SF Express, Aramex etc. Door to door, you may pay customs tax depends on your customs policy.
By air or by sea for bulky orders available.
FAQ:
1. Are you factory supplier?
Yes, we are manufacturer of LED lamps since 2008 and we have our own factory, supply duable super quality items and reliable after-sale service.
2. Do you supply OEM or ODM?
Yes, we can supply OEM and ODM serice with favorable price and we have our own mould workshop, your brand and logo can be printed on the items.
3. How long will it spend for our orders to be sent out?
It takes 3-5 days for samples at common requirements, and 10-15 days for big order such as 3000pcs led flood light.
4. What about your after-sales servie and warranty policy?
PREVIOUS:5 Years Warranty 100W SMD Module LED Floodlight with 60-Degree 90-Degree Illumination
NEXT:New type 60W Waterproof Super Bright Outdoor Lighting Module LED Floodlight with 5 Years Warranty