IP65 LED 200W die-casting module patch tunnel light for advertising board lighting
Technical data:
Item name | LED SMD module tunnel light 200W |
Power | 200W |
Light Source | Lumileds SMD3030 |
Input Voltage | AC100-265V, 50-60Hz |
Color Temperature | 3000-6500K |
Light effect | 130LM/W |
Lumen | 26,000LM |
PF | ≥0.95 |
CRI | Ra.≥80 |
IP grade | IP65 |
Viewing angle | 30° 60° 90° 70x140° |
Materials | Die-casting Aluminum + reinforced PC |
Operating Temp. | -25ºC to +45ºC |
Applications | Tunnel,park,bridge,plant, workshop,stadium, etc. |
Qty / CTN | 1PC |
N.W. | 6KG |
G.W. | 6.8KG |
Lamp dimensions | 370 x 330 x 280mm |
Carton size | 41 x 37 x 18cm |
Lifetime | 50,000 hours |
Quality warranty | 5 years |
Certificates | CE,ROHS, EMC, LVD, ISO9001 |
Product manual:
1.Long life, can be used for more than 10 years under normal circumstances.
2.The light is even and soft, and the brightness is high. The color rendering is good, the color of the real object is more realistic, and various light colors are available to meet the needs of different environments.
3.Quick start, no flicker, no noise,no radio frequency interference.
4.Using high efficiency constant current driver, wide voltage input, can work in places with unstable voltage.
5.Lightning protection, the lamp body is made of aluminum alloy material, high strength, corrosion resistance and weather resistance, good heat dissipation.
6.Green and environmentally friendly, using lead-free and mercury-free process.
Application:
Tunnel,outdoor engineering lighting, highways, trunk roads, flyovers, streets, squares, schools, residential areas, industrial area and other outdoor lighting places.
Installation instructions:
1. Non-specialist electricians please do not repair or modify this product without authorization;
2. Please turn off the power before installation;
3. Before installation, please check whether the voltage marked on the lamp is consistent with the input voltage to be connected;
4. In order to ensure the service life of the product, please do not use it in a place with strong acid mist;
5. Pay attention to shock protection during installation and transportation;
6. Before installation, ensure that the installation position can withstand 10 times the weight of the product, and install it in a flat place without vibration, no swing, no fire hazard;
7. If the lamp fails, please place the lamp in one place and send it back to the company for inspection and repair.
8. If the lamp body or wire is damaged, please stop using it immediately.
Our workshop:
We have 6 production lines at production department, including assembling, inspection and aging test lines.
Production ability: 3-5 days for 500pcs LED tunnel light, and 10-15 working days for 3000pcs LED tunnel lights at common requirements.
Each Lamp must pass 24 hours aging test and high voltage (6KV) surge test before we make packing and make delivery.